Why: The purpose of the project is to renew the aging infrastructure on the affected streets.

What: Specifically, the works proposed include the rehabilitation and/or replacement of:

  • sidewalks, road structure and pavement
  • watermains and sewers
  • lateral services to the property line

When: The current project schedule is as follows:

  • design – fall 2018 to spring 2019
  • construction – 2019-2020

Where: The streets included as part of this project are:

  • Mann Avenue from Russell Avenue to approximately 13 metres east of the Range Road intersection
  • Range Road from Mann Avenue to Somerset Street east
  • Templeton Street from Range Road to Chapel Street
  • Russell Avenue from Somerset Street to Osgoode Street
  • Lane 119V (rear of Range Road and Marlborough Avenue) from Mann Avenue to 35 metres north

01 PLATE 1 MANN AVENUE – GEOMETRY

02 PLATE 2 RANGE ROAD – GEOMETRY

03 PLATE 3 TEMPLETON STREET – GEOMETRY

04 PLATE 4 RUSSELL AVENUE – GEOMETRY

05 PLATE 1 MANN AVENUE – SEWERS

06 PLATE 2 RANGE ROAD – SEWERS

07 PLATE 3 TEMPLETON STREET – SEWERS

08 PLATE 4 RUSSELL AVENUE – SEWERS

09 LARGE AREA AT INTERSECTION RANGE ROAD – GEOMETRY

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes:

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>